E-blog: 3/1

posted in: Uncategorized | 0

Today, the robotics team is picking up work for FRC Season following their final FTC competition on Sunday. The engineers are making and mounting an e-board onto a drive base to use for driving practicing. They are also preparing extra chains … Continued

E-Blog: 2/26

posted in: Uncategorized | 0

The BHS Iron Panthers are focusing on FTC, since FRC build season is over. The programming team is going over the code for both kitten and panther robot. They are looking for any flaws and rewriting code so the robot … Continued

E Blog: 2/23

posted in: Uncategorized | 0

Today, both the programming and engineering team are making final arrangements to prepare for final testing before bagging the robot. After the robot has been bagged, the team can no longer make changes to it. The engineering team is working … Continued

E-Blog: 2/22/16

posted in: Uncategorized | 0

The programmers, Maxim and Jerry, are working with the launch pad. They are working with input pins and eventually create a button that will be able to send commands to the robot through the code by pressing the button. The … Continued

E-Blog: 2/19

posted in: Uncategorized | 0

Today, the Iron Panthers are prepping for the practice competition, which takes place Friday night and Saturday at Bellarmine.

E-Blog: 2/18

posted in: E-Blog | 0

Today the engineers worked on finishing the bumpers and the breaching arm. They also finished the second phase intake, which is the part that pulls the ball into the shooter. The programmers focused on testing intake mechanisms.

E-Blog 2/17

posted in: Uncategorized | 0

Today, the programming team is working on a variety of things. Some people are focused on making the final wiring for the robot while others are testing PID on the drive base. Additionally, the programming team is also writing code … Continued

E-Blog 2/16

posted in: Uncategorized | 0

Today the programmers worked on pneumatics delay and the potentiometer. They also worked with image software and taking camera images.  They also began working on drive base PID and encoder values. The engineers worked primarily with the various parts of … Continued

E-Blog: Feburary 12th

posted in: Uncategorized | 0

Today, the programmers split into two teams.  Austin and Maxim is working on the PID and Peter is testing the sensors. The engineering team is also working on various projects. Rory is working on SolidWorks to scale the entire robot. … Continued

E-BLOG 2/11 Meeting

posted in: E-Blog | 0

Today the programmers have been wiring the new e-board. They have also tested accelerometer values and PID control. Engineers have been attaching the shooter to the robot. Unfortunately, this week there was a major set-back when the mill broke. So … Continued

1 2 3 4 5